On Sep 26, 2004, at 11:13 AM, Erik Moeller wrote:
Kate-
I'm about to commit a major change to the
'old' table in HEAD.
Shouldn't we wait with major schema changes until REL1_4 is branched?
I've backed out the change until we have a better idea of the upgrade
cost. Unless it's surprisingly small I'd much prefer to push it back to
post-1.4 and get 1.4 wrapped up soon.
IMHO
major schema changes justify a major version number change, i.e.
1.4->2.0.
Brion?
(shrug)
-- brion vibber (brion @
pobox.com)