[Toolserver-l] Job scheduling and mail receiving

River Tarnell r.tarnell at IEEE.ORG
Sun Feb 13 00:33:50 UTC 2011


-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

In article <4D56A4CD.6020807 at surfeu.ch>,
Dr. Trigon <dr.trigon at surfeu.ch> wrote:
> But I was wondering how SGE can replace such a common tool like CRON 
> without havin same functionallity... :)

Well, SGE does not replace cron.  SGE is an additional tool which is 
available to users; cron is not going away (indeed, cron is required to 
use SGE, except for one-shot jobs).

We would like all users to use SGE for their tools, which requires that 
everything which cron does on its own should *also* be possible, and 
easy, with SGE; otherwise users will not bother converting.  However, 
this is an ongoing process and is obviously not complete.

	- river.
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.11 (NetBSD)

iEYEARECAAYFAk1XJp8ACgkQIXd7fCuc5vIq8wCfV0T+TfolyRsG99FEvJrWXce8
mAcAoKHn2Ln22VUgMj79xIm+UZ5ANZ9J
=iPMK
-----END PGP SIGNATURE-----



More information about the Toolserver-l mailing list