On Thu, Jan 29, 2009 at 1:52 AM, Gerard Meijssen gerard.meijssen@gmail.com wrote:
Hoi, Two things:
- if we abort the backup now, we do not know if we WILL have something at
the time it would have ended
- if the toolserver data can provide a service as a stop gap measure why
not provide that in the mean time
If you want to play the optimist and believe this dump might eventually accomplish something, then the right stopgap would be the hack the dumper so that it periodically regenerates the other files even while the big dump is still running. Such a thing, though definitely a hack, would not be hard to do.
-Robert Rohde